      If you can't Sign In, you need to reset your password.  Use the Forgot Your Password link at the bottom of the Sign In screen, and the site will send you an email to reset it. If you have an AOL email account, use the Contact Us link at the bottom of the screen -- AOL is intermittently blocking email from the site.
    • Kent

      Site will be down Thurssday 10/19/17 for maintenance   10/18/2017

      The site will be updated to the latest major release of the core software.. Due to the number of add-ons, the site may be down for a few hours.  Thanks for your patience and understanding.

Gene's Shop

Sign in to follow this  
Followers 0
  • entries
    13
  • comments
    36
  • views
    1,781

Shop Build

gwiseman

376 views


Well. I am finally beginning that garage build I've discussed and planned for some time. Linda really wants my shop, tractor, equipment, & parts collection out of the basement. So, with her blessing, I began the process October 2016. I have been intentionally slow to allow myself analysis time to decide what exactly I want and, to allow some adjustment in Linda's expectations (looks, colors, landscape, etc).

image.thumb.jpeg.f6d0d201d4a7e33026b6c054223be04f.jpeg

image.thumb.jpeg.a1a1c733d4fadda1f4c504ded75cf070.jpeg

October 10, 2016 my friend and contractor Mike Schneiders brought his track loader in to clear and level our an area for a garage behind our house.

 

image.thumb.jpeg.e753e23685023ad0e12af3695ab58bed.jpegTopography here is rough w/steep grades so it was critical to excavate in the location chosen to get the area I wanted (initially 30x30). When finished Mke announced "it looks like you'll be building a 24x40 unless you want a deeper cut. 24x40 it will be. Above is the finished cut viewed from our deck. A neighbor & I groomed, sedrd & mulched quickly to get a grass stand to hold the soil.

 

image.thumb.jpeg.a3012cc383362449da414b36791c200f.jpeg

Nosey neighbors.

 

image.thumb.jpeg.414a9481836b58c3bc22f7f58a800b08.jpeg

This shot is of a diversion ditch I cleaned out that runs along the hill just above the the garage site. Lots of rain water runs off the hill especially in springtime and it'll be helpful to divert from the garage area. 

 

image.thumb.jpeg.d7b03b991187feb69bc630900637e2b3.jpeg

A tree beside our house was removed to make room for a drive. 

 

image.thumb.jpeg.07f90fb1407b264b4d793c672a46f970.jpeg

A shot from the site towards our deck and screened-in porch from where I'll take several pictures. Removing part of the tree w/my newly acquired Sovereign 3012 Hydrolift and Agri-Fab Utility 10 Carry-all.  

 

image.thumb.jpeg.14c5f70e5afc84293d13415a0efe1dc7.jpeg

September 13, 2017 my concrete contractor, Greg Rackers and his crew (Grey Stone Foundations) dig and pour footings.

 

image.thumb.jpeg.37c85bdf0a8f821c502267e8c112d0a0.jpeg

image.thumb.jpeg.a0f7224cc9eda84c852f4c9d12c1c8d5.jpeg

Cole County Industries, Jefferson City supplied the concrete. These drivers can back a huge concrete truck up, around, down and into some tight places. Kudos to their driving and backing skills!

 

IMG_0884.thumb.JPG.b2d9f4310f25e9b2f4446b2af31e6ffb.JPG

Greg Rackers, Grey Stone Foundations and his crew hard at work. 

 

image.thumb.jpeg.4be66df54f30df3ab8ef5c26d7e1331c.jpeg

The footing pour complete.

 

5B579F1D-C175-410E-994E-551DB324B5C6.thumb.jpeg.89bf27ffc9190be1e2290acd44352ce7.jpeg70942822-9C0B-40F0-8295-BBA2D3C18930.thumb.jpeg.4323a2254999a982c1c3081d0dd4463c.jpeg

On Sunday September 17 we received the nicest all day .07” rain you could ask for. On Monday, September 18 a 2” downpour came in 40 minutes. Needless to say I’ve been digging off the footings. Will finish shoveling today (Sept 23) then brush and blow dirt off concrete. Hopefully it doesn’t happen again before walls & floor are poured. 

 

IMG_0975.thumb.JPG.feae66a1734d73c03ee1f1761a756a03.JPG

I scooped, broomed, and blew off the footing to get as clean as I possible and ready for the concrete retaining walls. It was two hot and humid Indian Summer days in Missouri and I sweat a ton but it was worth it in the long run. Ready for the concrete crew. 

 

IMG_0976.thumb.JPG.3bd9633906b5545b2321251499b23b98.JPG

IMG_0977.thumb.JPG.6222d21121717db922f590a4c69d2f63.JPG

Tuesday, September 26, 2017. Our concrete construction crew Grey Stone Foundations arrived and began the process of setting forms.


IMG_0978.thumb.JPG.368a448062f0363100e55c30760cd04d.JPG

IMG_0979.thumb.JPG.131d78b5529c6f7b80a7238325296000.JPG

IMG_0980.thumb.JPG.c1d1480fdb9395bebc8918ae73640e42.JPG

The 4 man crew worked non-stop through the morning and, just as the last of the forming was complete and inspected by the foreman, concrete trucks arrived (early afternoon). 

 

 

IMG_0988.JPG

Forms removed Wednesday, September 27. Picture taken facing westward from our deck. In the foreground is the retaining wall for the floor that will be under the 8' overhang on the east side of the shop. In the background is the 4' retaining west sidewall of the shop and front wing wall. 

 

IMG_0990.JPG

IMG_0991.JPG

Standing on the west side of our house and facing northward,  the wing wall and west sidewall of the shop. You can also see the 3'x 4' concrete front corner of the shop (southwest)  and 3'x4' concrete rear corner (northwest).   And of course, to the right is the retaining wall for the east side "porch".

 

IMG_0994.JPG

Friday, September 29 while I was in Bloomington IN at the Executive Committee meeting with Kent Thomas (Kent), Josh Thornton (Talntedmrgreen), and Carl Harcourt (CarlH), my carpenter Dale Feeler coated the sealed the retaining wall. Pictured looking southward from the rear of the building toward the back (north) and side (west) of our house.

 

fullsizeoutput_8a1.thumb.jpeg.e676d952156d62349489caa1e5a1ae76.jpeg

Cooper, our English Cream Golden Retriever surveying the work. 

 

IMG_0996.JPG

From the back northeast side of the shop building site. The topography of our property is shown better here and we are lucky as most Jefferson City construction jobs encounter bedrock. As you can see we are blessed with soil, heavy clay soil that dries hard as a bulls horn! Dale delivered drainage tile that will be laid on top of the footing and next to the outside of the west sidewall, then covered with aggregate. 

 

IMG_1004.thumb.JPG.6305c5a9efdb91c92a3f7fafab5f862e.JPG

So on Saturday, September 30 I decided to have a little fun and to get an idea of how much floor space these guys will take. I needed to remove the sickle from the Early B-10 anyway and pallet it for shipment, knock down and smooth some of the dirt around the construction, and mow some grass so this was justifiable... A neighbor showed up during the operation and asked if I wanted to borrow a tarp.

 

fullsizeoutput_8a4.thumb.jpeg.6877f7374cf9b23e6d5f9be1525251d2.jpeg

Forecast of rain this brought the Raithel Plumbing in ahead of schedule on Monday, October 2. Tractor is a 29hp New Holland w/loader and backhoe; amazing what this small machine can accomplish. 

 

IMG_1024.thumb.JPG.93e53686e28a08975f4a3a692f8edb81.JPG

IMG_1023.thumb.JPG.446228b8f3db0a8322d0f3d6ef194e8e.JPG

IMG_1020.thumb.JPG.8fc132ec8e7075adffff41ae6c86cecd.JPG

IMG_1021.thumb.JPG.350e5e983172be763af174aabe896de2.JPG

Jerry Raithel used a tool I'd not seen before: an small electric device that takes the place of a transit. He could readily find the elevation off the floor at any given time by punch of a button. I should've gotten a picture of the $700 piece of technology. 

 

IMG_1022.thumb.JPG.f9132a05cbeff8834fb362010ee41f02.JPG

Dale also came to insulate and coat again the outside west concrete wall and install the drainage pipe on the foundation of the west wall. Plumbers used the New Holland loader tractor to cover with aggregate before Dale covered with filtration fabric.  

The rains came on Tuesday evening and have not stopped as of Saturday October 7 collecting 4.05" so far.  

I guess now is a good time to share my plans as they’ve evolved: 

6FD1EDFB-6773-41F0-A9A6-D5535F74B95E.thumb.jpeg.7b8c01910a5ce623c50ee5e5b1804b4f.jpeg

Shop will have a bathroom w/stool and utility sink located next to the stairway to the attic. Wood stove on north wall, 14’ garage door & 2 walk-ins. 

 

7EBBA830-AF61-4019-8C4C-6272E99CBAE0.thumb.jpeg.4552c686d9cf41fbe19c01375955ce3f.jpeg

Have decided on scissor trusses in front 1/2 to allow more vertical workroom area. 20’ of upstairs storage should be enough and, I’ve found a person fills up whatever storage they have so I decided to limit that for me (and Linda). 

 

AA77E3EF-3B24-4772-B1C3-9D43EAE35C09.thumb.jpeg.5f88f82aecd3be3c26912471af36591c.jpeg

A rough idea of the front (south facing) view. Overhead door will be significantly larger than it appears. 

 

IMG_1039.thumb.JPG.0196f1c921ba00079ae2c59e48cc881d.JPG

October 14; we've made no progress w/exception of me scooping dirt from the footings that washed in w/the rains. It's been dry this week and warm for October, but not warm enough dry the dirt to get cement trucks into the job site. Today, a cold front is scheduled in that may bring more rain. 


4 people like this


14 Comments


A lot different than what I saw in July.  You did follow my advice (partially, at least).  24 x 40 is larger than 30 x 30.  Still won't be big enough though.  :D

2 people like this

Share this comment


Link to comment
maxwood

Posted

Hello, That was a month ago ,is it done yet??  I was recently talking with a neighbor who was pricing material  and found the price quoted him had been raised ,because of the great demand for building materials in texas & florida , due to hurricanes  Keep up the good work..

 

Thanks Ken in Mi

Share this comment


Link to comment
gwiseman

Posted

Carl - adding an 8' porch to it and an attic. I know, still won't be big enough.

Ken - I messed up, should be Sept 13 so will edit that now. My luck, higher prices..

1 person likes this

Share this comment


Link to comment
maxwood

Posted

I will be looking forward to your progress!!

 

Thanks Ken in Mi

1 person likes this

Share this comment


Link to comment
B-16_IC

Posted

Oh yeah, timing.  I built my last building the year of Katrina, added a bit to the budget. Would still no doubt be much higher today. Looking forward to the progress.

2 people like this

Share this comment


Link to comment
Chris727

Posted

Looks like its moving along nicely. Will have to visit when its completed. 

1 person likes this

Share this comment


Link to comment
Kent

Posted

Gene, it is fun to watch you document your garage/shop build in your blog.  I wish more folks would create blogs to document builds, restorations, etc.  Way to "lead by example!"

1 person likes this

Share this comment


Link to comment
B-16_IC

Posted

Looks like you will still have breathing room! Nice looking concrete work, looks like money well spent. 

1 person likes this

Share this comment


Link to comment
B-16_IC

Posted

Got that stuff done in time huh? It's sure getting done right, enjoying the updates! dOd

1 person likes this

Share this comment


Link to comment
maxwood

Posted

Hello, Very impressive!!  And a toilet TOO! , How civilized. LOL.     I am Jealous 

Thanks Ken in Mi

 

1 person likes this

Share this comment


Link to comment
Chris727

Posted

Nice update and plans. Well thought-out. 

1 person likes this

Share this comment


Link to comment
B-16_IC

Posted

Plans look great, should be a nice setup! Have you consulted the insurance company about the wood stove? Some won't cover them. 

1 person likes this

Share this comment


Link to comment
gwiseman

Posted

1 hour ago, B-16_IC said:

Plans look great, should be a nice setup! Have you consulted the insurance company about the wood stove? Some won't cover them. 

Thanks Rich. I haven’t talked to the insurance company; probably should do that bf installation. Was also thinking of installing a split heat/air unit but not definite. Will need some sort of backup for cold nights & when away. If I foam it won’t need much heat. 

Share this comment


Link to comment
B-16_IC

Posted

I've heard great things about the foam, more expensive but is a better job. I know my insurance allows wood heat if installed by a set of rules they have. 

Share this comment


Link to comment
Guest
You are commenting as a guest. If you have an account, please sign in.
Add a comment...

×   You have pasted content with formatting.   Remove formatting

  Only 75 emoticons maximum are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor